2020 09 01 at 09 53 51

 


  LATEST UPDATES – DERNIÈRES MISES À JOUR – FEBUARY 5, 2024

ON/SUR

MOTHERMEERAFUTURECOLLEGE.ORG WEBSITE

 

FEBUARY 5, 2024 – 5 FÉVRIER 2024

At: Energy Management / Solar Energy : Solar Installations.jpg and text:

Solar Energy (2).docx - added

À : Gestion de l’Énergie / Énergie Solaire : Solar Installations.jpg et le texte : L’Énergie Solaire (2).docx - rajoutés

At : Technical Service Center : image added : Technical Service Center (5f).jpg

À : Centre de Services Techniques : image rajoutée : Technical Service Center (5f).jpg

FEBUARY 4, 2024 – 4 FÉVRIER 2024

At: Energy Management / Solar Energy / Diagram (new selection) added and : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - added

À: Gestion de l’Énergie / Énergie Solaire / Diagramme (nouvel onglet) rajouté et le plan : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - rajouté.

FEBUARY 3, 2024 – 3 FÉVRIER 2024

At : Energy management / - Geothermal : the sub-selection - Diagram is added and the plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - is added.

À : Gestion de l’énergie / - Géothermie : le sous-onglet - Diagramme, est rajouté et le plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - est rajouté.

FEBUARY 2, 2024 – 2 FÉVRIER 2024

At: Housing / 2 new sub-selections added: - On campus, and - Off campus

The sub-selections - Teachers Residence and - Students Residence, are moved as a sub-selection under - On campus

Under the sub-selection - Teachers Residence: the illustration of the Teachers Residence and the text is added

and, under - Students Residence: The illustration of the Students Residence and the text is added.

The illustration and the text under the selection - Housing / is moved under the selection - Off campus.

À : Habitation / deux sous-onglets sont rajoutés : - Sur le campus, et

- Hors campus. Les sous-onglets - Résidence Prof et - Résidence étudiantes, sont déplacés sous le sous-onglet : Sur le campus.

Sous l’onglet - Résidences Prof : l’illustration de la Résidence Prof et le texte sont rajoutés. De même que pour la Résidence étudiants.

L’illustration sous l’onglet - Habitation : est déplacé sous l’onglet - Hors campus.

DECEMBER 20, 2023 – 20 DÉCEMBRE 2023

At : Plans / Campus Infrastructure / Campus Layout Version 1: Plan revised / Plan revue.

JULY 9, 2023 – 9 JUILLET 2023

At : Plans / Teachers Residence / First floor / Architecture /

TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.

Plans / Teachers Residence / Second/Fifth floors / Architecture /

TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.

Plans / Teachers Residence / Façade / TEACHERS RESIDENCE FAÇADE FRONT WING ELEVATION / TEACHERS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.

At : Plans / Students Residence / First floor / Architecture /

STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.

Plans / Students Residence / Second/Fifth floors / Architecture /

STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.

Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.

Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - new plan added.

À : Plans / Résidence des professeurs / Premier niveau / Architecture /

TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.

Plans / Résidence des professeurs / Niveaux 2, 3, 4, 5 / Architecture /

TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.

Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.

Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.

À : Plans / Résidence étudiants / Premier niveau / Architecture /

STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.

Plans / Résidence étudiants / Niveaux 2, 3, 4, 5 / Architecture /

STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.

Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.

Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.

 

JULY 1, 2023 – 1 JUILLET 2023

New sub-selection (Housing/Habitation) added at : Plans. Sub-selections (Teachers residence) and (Students residence) added at Housing/Habitation.

Nouvel onglet (Housing/Habitation) rajouté à : Plans. Sous-onglets (Teachers residence) et (Students residence) added at Housing/Habitation.

JUNE 26, 2023 – 26 JUIN 2023

New selection “MANAGEMENT” added at : City College

New selection added at : “MANAGEMENT” for “OPERATIONAL ORGANIGRAM” and “CITY COLLEGE_OPERATIONAL ORGANIGRAM_APRIL 28, 2023.pdf” added.

Nouvel onglet « GESTION » rajouté à : Cité Collégiale

Nouvel onglet ajouté à : « GESTION » pour « ORGANIGRAMME OPÉRATIONNEL » et le dessin « LA CITÉ COLLÉGIALE_ORGANIGRAMME OPÉRATIONNEL_24 MAI 2023.pdf ajouté.

JUNE 26, 2023 – 26 JUIN 2023

New selection “Campus infrastructure” added at : Plans

At “Campus infrastructure”, “Campus layout version 1’’ added.

Nouvel onglet « Campus infrastructure » rajouté à : Plans.

À l’onglet « Campus infrastructure », Campus layout version 1 » rajouté.

NOVEMBER 20, 2022 – 13 NOVEMBRE 2022

At : Electrical Power Station Add /À : Centrale Électrique rajouté :

ELECTRIC POWER STATION_BLOC DIAGRAM_OCT 19, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_BASEMENT_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_1ST FLOOR_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_2ND FLOOR_OCT 14, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_3RD FLOOR_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_ROOF_OCT 18, 2022.pdf

NOVEMBER 13, 2022 – 13 NOVEMBRE 2022

At/À : Add new selection : Electrical Power Station/Centrale Électrique

SEPTEMBER 6, 2022 – 6 SEPTEMBRE 2022

At/À : Plans > Trades school/École des Métiers > Basement/Sous-sol > Electrical/Électrique > New electrical plans added/Nouveaux plans électriques rajoutés (Electrical items, their locations and the wiring schedule)/(Fixtures électriques, leur localisation et le schéma de filage).

The same for the 1st, 2nd, and 3rd floors/De même pour les 1er, 2ième et 3ième étages.

AUGUST 6, 2022 – 6 AOÛT 2022

At/À : Scale model/Maquette > new sélections added/nouvelles sélections rajoutées :

> Photos Scale model/Photos de la maquette

>Video presentation Mother Meera/Vidéo présentation Mère Meera

Text and video added/Texte et vidéo rajoutés.

JULY 28, 2022 – 28 JUILLET 2022

Replace de following for updated plans/Remplacer les plans suivants pour des plus récents :

At/À : Plans > Sports Center/Centre sportif > Basement/Sous-sol > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_BASEMENT_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > First level/Premier niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FIRST LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Second level/Deuxième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_SECOND LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Third level/Troisième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_THIRD LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Fourth level/Quatrième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FOURTH LEVEL_JULY 24, 2022.pdf

JULY 24, 2022 – 24 JUILLET 2022

At/À : Project Planning/Planification > Design progression/Progression conceptual — Progression achievement chart updated/Tableau d’accomplissement progressif mis à jour.

JULY 6, 2022 – 6 JUILLET 2022

At/À : Geothermal/Géothermie — Selection moved to next level and replaced by/La selection est déménagée au prochain niveau et remplacée par : > Energy management/Gestion de l’énergie – next level selections/selections au niveau suivant :

> Electrical energy/Énegie électrique

> Solar energy/Énergie solaire

> Geothermal/Géothermie

JUNE 7, 2022 – 7 JUIN 2022

At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER RECYCLING PATH_JUNE 5, 2022.pdf added/rajouté.

JUNE 1, 2022 – 1 JUIN 2022

At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau (added/rajouté) and/et :

At/à : Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER CYCLE_MAY 28, 2022.pdf – added/rajouté.

APRIL 21, 2022 – 21 AVRIL 2022

At/à : Water management/Gestion de l’eau > Rainwater treatment/Traitement de l’eau de pluie > Détailed plans/Plans détaillés : New plans added/Nouveaux plans rajoutés : WATER MANAGEMENT_POTABLE WATER SYSTEM_FEB 24, 2022.pdf

Et/and : WATER MANAGEMENT_SWIMMING POOL WATER TREATMENT SYSTEM_FEB 24, 2022.pdf

APRIL 19, 2022 – 19 AVRIL 2022

At/à : Housing/Habitation > Image and text added/image et texte rajouté.

APRIL 18, 2022 – 18 AVRIL 2022

At/à : Plans > Garage & Engineering/Garage & Ingénierie (new selection/nouvelle sélection) : New plans for architecture – structure – elevation added/Nouveaux plans d’architecture – structure – élévation rajoutés.

APRIL 14, 2022 – 14 AVRIL 2022

At/À : Home/Accueil > New selection added for CLIMATE, opening to a new page for climate conditions throughout the year at Madanapalle/Nouvelle selection rajoutée pour le CLIMAT, ouvrant une nouvelle page pour les conditions climatiques durant l’année à Madanapalle.

APRIL 10, 2022 – 10 AVRIL 2022

At/À : Home/Accueil > A gifts from Mother (photo and text) moved from the Home page to the horizontal selection bar / Un Cadeau de Mère (photo et texte) déménagé de la page d’accueil vers la sélection horizontale.

 

MARCH 11, 2022 – 11 MARS 2022

At/à : Plans > Sports center/Centre sportif > Basement/Sous-sol > Footing – Empattement : Replace existing plan by/Remplacer le plan existant par:

SPORTS CENTER_STRUCTURE_BASEMENT FOOTINGS & COLUMNS_FEB 16, 2022.pdf

At/à : Plans > Sports center/Centre sportif > First level/Premier niveau > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_1 ST LEVEL POOL FOOTINGS, BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Second level/Deuxième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_2 ND LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Third level/Troisième niveau > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_3 RD LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Fourth level/Quatrième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_4 TH LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Roof/Toiture > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_ROOF BEAMS_MARCH 6, 2022.pdf

MARCH 9, 2022 – 9 MARS 2022

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Front view of third support wall structure : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_FRONT VIEW OF THIRD SUPPORT WALL_FEB 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – left side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_LEFT SIDE_FEB 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – right side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_RIGHT SIDE_FEB 24, 2022.pdf

MARCH 1, 2022 – 1 MARS 2022

At/À : Home/Accueil > A gifts from Mother added (photo and text)/Un Cadeau de Mère ajouté (photo et texte)

FEB 23, 2022 – 23 FÉV 2022

At/À : Plans > College/Collège > Construction details/Détails de construction : plans added/plans rajoutés :

  • COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS-FRONT VIEW_FEB 15, 2022
  • COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS- SIDE VIEW
  • COLLEGE_CONSTRUCTION DETAILS_CLASSROOMS_FEB 23, 2022

FEB 22, 2022 – 22 FÉV 2022

At/À : Plans > Trades School/École des Métiers > First floor/Premier étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_FIRST FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_SECOND FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_THIRD FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Basement/Sous-sol > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_BASEMENT FOOTING & COLUMNS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Roof/Toiture > Structure : New plan added/Nouveau plan rajouté: TRADES SCHOOL_STRUCTURE_ROOF BEAMS STRUCTURE_FEB 14, 2022

FEB 20, 2022 – 20 FÉV 2022

At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_SECOND FLOOR_FEB 14, 2022

At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_THIRD FLOOR_FEB 14, 2022

At/À : Plans > Trades School/École des Métiers > Sous-sol/Basement > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_BASEMENT_FEB 14, 2022

JAN 23, 2022 – 23 JAN 2022

At/À : > Home

Citations & pictures of Mother Meera added

Citations et photos de Mère Meera rajoutées

JAN 20, 2022 – 20 JAN 2022

At/À : > Home

A train of images added : About Madanapalle

Un train d’images rajoutés : À propos de Madanapalle

 

JAN 6, 2022 – 6 JAN 2022

YouTube videos added/Vidéos YouTube rajoutées :

Mother Meera School (Par-1) – Jan 24, 2020 – 18.08 min

https://www.youtube.com/watch?v=A4N9LIALtAo

Mother Meera & Mother Mirra. – YouTube – 5.36 min.

https://www.youtube.com/watch?v=oXiWCE-8qLo

Mother Meera on Covid-19 - YouTube – 2.57 min. – Aug 11, 2021

https://www.youtube.com/watch?v=sE5yIlMei2A

MahaMaya – Mother Meera – 4.34 min – March 2020

https://www.youtube.com/watch?v=siaKCp9ekXY

La lumière blanche – The white light – Mother Meera – 11.28 min

https://www.youtube.com/watch?v=YLcNes67WRY

Ascent & Descent – Ascension & Descente – Mère Meera – 15.12 min.

https://www.youtube.com/watch?v=z63ytZranc8

What is God? – Mother Meera answers 1, Seg 1 – 47.07 min

https://www.youtube.com/watch?v=yOeV0nmycws

The Divine Light – Mother Meera Answers 1, Seg 2 – 48.02 min

https://www.youtube.com/watch?v=0K0EKcZ8Byg

True Visions – Mother Meera Answers 1, Seg 3 – 48.01 min

https://www.youtube.com/watch?v=1oXYdZBuFVc

What is Love? – Mother Meera Answers 1, Seg 4 – 37.54 min

https://www.youtube.com/watch?v=aDsk88OPxbk

Colors of Love – Darshan of Mother Meera – 14.44 min

https://www.youtube.com/watch?v=-s1u5HmXX4Q

Mother Meera – 6.28 min

https://www.youtube.com/watch?v=2m86MEQXgZk

 

DEC 31, 2021 – 31 DÉC 2021

At/À : > Foundation/Fondation

🔷 Information :

Revised pictures/Images révisées

 

Text revised : Why a Foundation – revised

Texte révisé : Pourquoi une Fondation

 

Text added : Necessary obligations to create and operate a registered non-profit Foundation

Texte rajouté : Exigences nécesaires à la création et à l’opération d’une Fondation OSBL enregistrée

 

Text added : Managing a Non-profit Organization

Texte rajouté : Gestion d’un Organisme OSBL

 

SEPT 23 2021 – 23 SEPT 2021

At/à : > Project volunteers/Bénévoles

  • Work at home/Travail à la maison
  • - Electrotechnical engineering ̶ Ingénierie Electro-technique

Text added/Texte rajouté : Electrotechnical Engineering.docx

 

AUGUST 31, 2021 – 31 AOÛT 2021

At/À: Project volunteers/Bénévoles > Small personal project/Petit projet personnel > At/À : Small personal project description/Description de petit projet personnel,

- Academic classroom design – Conception de classe académique

Image and text added/Image et texte ajoutés.

At/À : Sports Center/Centre Sportif > Third level/Troisième niveau

Change in sélections/Changement de sélections

  • Information
  • Auditoriums
  • Game watch mezzanine/Mezzanine d’observation
  • Restrooms/Salles de toilettes

At/À : Sports Center/Centre Sportif > Third level/Troisième niveau

  • Auditoriums : Image and text added/Image et texte ajoutés

AUGUST 30, 2021 – 30 AOÛT 2021

At/À: Project volunteers/Bénévoles

Another selection added :

  • Work at home/Travail à la maison
  • Work on site/Travail en chantier
  • Small personal project/Petit projet personnel (added selection)

At/À: > Small personal project/Petit projet personnel

Image and text added/Image et texte rajoutés

AUGUST 22, 2021 – 22 AOÛT 2021

At/À : Scale Model/Maquette > Professional photos of the Sports Center, the College and the Trades School added/Photos professionnelles du Centre Sportif, du Collège et de l’École des Métiers rajoutées.

AUGUST 22, 2021 – 22 AOÛT 2021

At/À : Project volunteers/Bénévoles > Small personal project/Petit projet personnel (new selection added/nouvelle selection rajoutée)

MAI 28, 2021 – 28 MAI 2021

At/à : Home : Image of the City College changed with a professional photo /L’image de la Cité Collégiale change avec une photo professionnelle. (City College_PAN_ISA.Jpg)

Same photo added at/Même chose à : City College/Cité Collégiale

And the same photo has been added

At > Scale Model (at the top of the pictures)/La même photo a été rajoutée à : /Maquette (au tout début des images).

APRIL 24, 2021 – 24 AVRIL 2021

At/à : Sports Center/Centre sportif > First level/Premier niveau > Swimming pool/Piscine > Air treatment/Traitement de l’air – Add text/rajouter le texte :

Air and humidity treatment/Traitement de l’air et de l’humidité.

MARCH 24, 2021 – 24 MARS 2021

At/à : Project Planning/Planification > Design progression/Progression conceptuelle : Achievement chart updated /Tableau d’accomplissement mis à jour.

 

MARCH 4, 2021 – 4 MARS 2021

At/à : Sports Center/Centre sportif > Basement/Sous-sol : New plan added/Nouveau plan rajouté.

Sports Center_Architecture_Basement level & Water Treatment Systems

Same plan added at : Plumbing & Water Treatment Systems/Plomberie & Systèmes de traitement de l’eau.

At/à : Sports Center/Centre sportif > First Level/Premier niveau > Architecture plan updated/Plan d’architecture révisé :

Sports Center/Centre Sportif_ Architecture_First level_March 2, 2021

At/à : Sports Center/Centre sportif > Second Level/Deuxième niveau > Architecture_Plan updated :

Sports Center_Architecture_Second level_March 2, 2021

At/à : Sports Center/Centre sportif > Third Level/Troisième niveau > Architecture plan updated/Plan d’architecture révisé :

At/à : Sports Center/Centre sportif > Fourth Level/Quatrième niveau > Architecture plan updated/Plan d’architecture révisé :

Sports Center_Architecture_Fourth level_March 2, 2021

At/à : Sports Center/Centre sportif > Roof level/Niveau toiture > New Architecture plan added/Nouveau plan d’architecture :

Sports Center_Architecture_Roof level_March 2, 2021

And/et :

At/à : Trades school/École des métiers > elevation/élévation : New plan added/Nouveau plan rajouté :

Trades school_Elevation_View of workshop inside wall_Feb 19, 2021

FEBUARY 15, 2021 – 15 FÉVRIER 2021

At/à : Sports Center/Centre Sportif > First level/Premier niveau > Information > Add image of pool/rajouter l’image de la piscine

And/et : Text/Texte : Olympic Swimming Pool/Piscine Olympique.

FEBUARY 11, 2021 – 11 FÉVRIER 2021

At/à : New plans/Nouveaux plans.

  • Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à : > Sports Center/Centre sportif

  • Fourth level/Quatrième niveau
  • Gym fitness/Conditionnement physique (New selection/nouvelle sélection)
  • Image and text added/Image et texte rajouté
  • Text/Texte : Physical activities in education/Activité physique en éducation.

FEBUARY 6, 2021 – 6 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > First level > Plumbing > POOL_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

FEBUARY 5, 2021 – 5 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS LEFT RESTROOM_FEB 1, 2021
  • And/et

FEBUARY 3, 2021 – 3 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Trades school > First floor > Plumbing
  • Plans > Trades school > Second floor > Plumbing
  • Plans > Trades school > Third floor > Plumbing

FEBUARY 2, 2021 – 2 FÉVRIER 2021

At/à : Plans > College/Collège > First floor/Premier étage > Plumbing/Plomberie : New plans added/nouveaux plans rajoutés

  • College_First floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_First floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_First floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021

And/et

  • College_Second floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Second floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Second floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021

And/et

  • College_Third floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Showers_Feb 1, 2021
  • And/et
  • College_Fourth floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Showers_Feb 1, 2021

JANUARY 29, 2021 – 29 JANVIER 2021

New plans added/Nouveaux plans rajoutés :

At/à : Plans > Trades school > Structure > Basement footings

And/et

At/à : Plans > Trades school > First floor > Footing > Footings & columns

Plans > Trades school > Second floor > Structure > Columns & Beams

Plans > Trades school > Third floor > Structure > Columns & Beams

JANUARY 27, 2021 – 27 JANVIER 2021

At/à : Project volunteers/Bénévoles

  • Work at home/Travail à la maison
  • Institutional architecture/Architecture institutionnelle
  • New text added/Nouveau texte rajouté

And/et :

At/à : Water management/Gestion de l’eau >

  • Rainwater harvest/Collecte eau de pluie
  • Detailed plans/Plans détaillés
  • New plan added/Nouveau plan rajouté
  • Rainwater harvest columns characteristics

JANUARY 26, 2021 – 26 JANVIER 2021

At/à : Water management/Gestion de l’eau >

Rainwater treatment/Traitement de l’eau de pluie >

Text added/texte rajouté : Rainwater Harvesting – Treatment process.

And/et :

At/à : Water management / Gestion de l’eau

  • Rainwater harvesting / Collecte eau de pluie
  • Detailed plans/Plans détaillés
  • New drawing added/Rajout d’un nouveau dessin
  • Rainwater Harvest Flow into columns & pre-filters.

And/et :

At/à : Water management / Gestion de l’eau

  • New selection added/Nouvelle selection rajoutée.
  • Stormwater treatment/Traitement eau d’orage

JANUARY 25, 2021 – 25 JANVIER 2021

At/à : Project planning/Planification du projet

  • Design progression/Progression conceptuelle
  • Development chart updated/Tableau de développement mis à jour.

JANUARY 23, 2021 – 23 JANVIER 2021

At/à : Water management/Gestion de l’eau >

Rainwater treatment/Traitement de l’eau de pluie >

Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.

And/et :

At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >

Gymnase glass walls (new selection – New plan/Nouvelle selection – Nouveau plan.

And/et :

At/à : Water management/Gestion de l’eau >

Rainwater harvest/Collecte eau de pluie >

Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.

JANUARY 21, 2021 – 21 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Third level/Troisième niveau > Steel beams auditorium floor – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >

Inside view of front wall (new selection – New plan/Nouvelle selection – Nouveau plan.

JANUARY 19, 2021 – 19 JANVIER 2021

At/à : Water management / Gestion de l’eau

  • Rainwater harvesting / Collecte eau de pluie
  • Image and text added / Image et teste rajoutée

At/à : Water management / Gestion de l’eau

  • Rainwater treatment / Traitement eau de pluie
  • Image added / Image rajoutée

At/à : Water management / Gestion de l’eau

  • Wastewater treatment / Traitement de l’eau usée

Image added / Image rajoutée

JANUARY 18, 2021 – 18 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Structure > Second level/Deuxième niveau – Revised plan/Plan révisé.

 

JANUARY 17, 2021 – 17 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Second level/Deuxième niveau > Court markings – New plan added/Nouveau plan rajouté.

And/et

At/à : Vertical selection : Rainwater/Eau de pluie, changed for/Changé pour : Water management /Gestion de l’eau

And at/et à :Water management /Gestion de l’eau > add new sélections/rajouter les nouvelles sélections :

Rainwater harvesting/Collecte eau de pluie

Rainwater treatment/Traitement eau de pluie

Wastewater treatment/Traitement eau usée

And/et

At/à : Construction site/Site de construction > New plan added/Nouveau plan rajouté.

At/à : Plans > Sports Center/Centre Sportif > Architecture > Second level/Deuxième niveau – Plan revised/Plan révisé.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > First level/Premier niveau – Footings/Empattement > New plan/Nouveau plan.

 

JANUARY 12, 2021 – 12 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Structure > Third level/Troisième niveau – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > Fourth level/quatrième niveau – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > Roof /Toiture –

New selection/Nouvelle sélection – New plan/Nouveau plan.

And/et

At/à : Plans > College/Collège > Roof /Toiture

New selection/Nouvelle sélection

And/et

At/à : Plans > Trades school/École des Métiers > Roof /Toiture

New selection/Nouvelle sélection

At/à : Latest updates/Dernières mises à jour

Reversed scroll down for previous updates/

Déroulement inversé pour les mises à jours antérieures.

 

 

JANUARY 11, 2021 – 11 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Architecture > Third level/Troisième niveau – Plan revised/Plan révisé.

 

Latest updates of 2020 – Dernières mises à jour de 2020