LATEST UPDATES – DERNIÈRES MISES À JOUR – FEBUARY 5, 2024
ON/SUR
MOTHERMEERAFUTURECOLLEGE.ORG WEBSITE
FEBUARY 5, 2024 – 5 FÉVRIER 2024
At: Energy Management / Solar Energy : Solar Installations.jpg and text:
Solar Energy (2).docx - added
À : Gestion de l’Énergie / Énergie Solaire : Solar Installations.jpg et le texte : L’Énergie Solaire (2).docx - rajoutés
At : Technical Service Center : image added : Technical Service Center (5f).jpg
À : Centre de Services Techniques : image rajoutée : Technical Service Center (5f).jpg
FEBUARY 4, 2024 – 4 FÉVRIER 2024
At: Energy Management / Solar Energy / Diagram (new selection) added and : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - added
À: Gestion de l’Énergie / Énergie Solaire / Diagramme (nouvel onglet) rajouté et le plan : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - rajouté.
FEBUARY 3, 2024 – 3 FÉVRIER 2024
At : Energy management / - Geothermal : the sub-selection - Diagram is added and the plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - is added.
À : Gestion de l’énergie / - Géothermie : le sous-onglet - Diagramme, est rajouté et le plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - est rajouté.
FEBUARY 2, 2024 – 2 FÉVRIER 2024
At: Housing / 2 new sub-selections added: - On campus, and - Off campus
The sub-selections - Teachers Residence and - Students Residence, are moved as a sub-selection under - On campus
Under the sub-selection - Teachers Residence: the illustration of the Teachers Residence and the text is added
and, under - Students Residence: The illustration of the Students Residence and the text is added.
The illustration and the text under the selection - Housing / is moved under the selection - Off campus.
À : Habitation / deux sous-onglets sont rajoutés : - Sur le campus, et
- Hors campus. Les sous-onglets - Résidence Prof et - Résidence étudiantes, sont déplacés sous le sous-onglet : Sur le campus.
Sous l’onglet - Résidences Prof : l’illustration de la Résidence Prof et le texte sont rajoutés. De même que pour la Résidence étudiants.
L’illustration sous l’onglet - Habitation : est déplacé sous l’onglet - Hors campus.
DECEMBER 20, 2023 – 20 DÉCEMBRE 2023
At : Plans / Campus Infrastructure / Campus Layout Version 1: Plan revised / Plan revue.
JULY 9, 2023 – 9 JUILLET 2023
At : Plans / Teachers Residence / First floor / Architecture /
TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.
Plans / Teachers Residence / Second/Fifth floors / Architecture /
TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.
Plans / Teachers Residence / Façade / TEACHERS RESIDENCE FAÇADE FRONT WING ELEVATION / TEACHERS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.
At : Plans / Students Residence / First floor / Architecture /
STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.
Plans / Students Residence / Second/Fifth floors / Architecture /
STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.
Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /
STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.
Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /
STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - new plan added.
À : Plans / Résidence des professeurs / Premier niveau / Architecture /
TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.
Plans / Résidence des professeurs / Niveaux 2, 3, 4, 5 / Architecture /
TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.
Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /
STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.
Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /
STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.
À : Plans / Résidence étudiants / Premier niveau / Architecture /
STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.
Plans / Résidence étudiants / Niveaux 2, 3, 4, 5 / Architecture /
STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.
Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /
STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.
Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /
STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.
JULY 1, 2023 – 1 JUILLET 2023
New sub-selection (Housing/Habitation) added at : Plans. Sub-selections (Teachers residence) and (Students residence) added at Housing/Habitation.
Nouvel onglet (Housing/Habitation) rajouté à : Plans. Sous-onglets (Teachers residence) et (Students residence) added at Housing/Habitation.
JUNE 26, 2023 – 26 JUIN 2023
New selection “MANAGEMENT” added at : City College
New selection added at : “MANAGEMENT” for “OPERATIONAL ORGANIGRAM” and “CITY COLLEGE_OPERATIONAL ORGANIGRAM_APRIL 28, 2023.pdf” added.
Nouvel onglet « GESTION » rajouté à : Cité Collégiale
Nouvel onglet ajouté à : « GESTION » pour « ORGANIGRAMME OPÉRATIONNEL » et le dessin « LA CITÉ COLLÉGIALE_ORGANIGRAMME OPÉRATIONNEL_24 MAI 2023.pdf ajouté.
JUNE 26, 2023 – 26 JUIN 2023
New selection “Campus infrastructure” added at : Plans
At “Campus infrastructure”, “Campus layout version 1’’ added.
Nouvel onglet « Campus infrastructure » rajouté à : Plans.
À l’onglet « Campus infrastructure », Campus layout version 1 » rajouté.
NOVEMBER 20, 2022 – 13 NOVEMBRE 2022
At : Electrical Power Station Add /À : Centrale Électrique rajouté :
ELECTRIC POWER STATION_BLOC DIAGRAM_OCT 19, 2022.pdf
ELECTRIC POWER STATION_ARCHITECTURE_BASEMENT_OCT 18, 2022.pdf
ELECTRIC POWER STATION_ARCHITECTURE_1ST FLOOR_OCT 18, 2022.pdf
ELECTRIC POWER STATION_ARCHITECTURE_2ND FLOOR_OCT 14, 2022.pdf
ELECTRIC POWER STATION_ARCHITECTURE_3RD FLOOR_OCT 18, 2022.pdf
ELECTRIC POWER STATION_ARCHITECTURE_ROOF_OCT 18, 2022.pdf
NOVEMBER 13, 2022 – 13 NOVEMBRE 2022
At/À : Add new selection : Electrical Power Station/Centrale Électrique
SEPTEMBER 6, 2022 – 6 SEPTEMBRE 2022
At/À : Plans > Trades school/École des Métiers > Basement/Sous-sol > Electrical/Électrique > New electrical plans added/Nouveaux plans électriques rajoutés (Electrical items, their locations and the wiring schedule)/(Fixtures électriques, leur localisation et le schéma de filage).
The same for the 1st, 2nd, and 3rd floors/De même pour les 1er, 2ième et 3ième étages.
AUGUST 6, 2022 – 6 AOÛT 2022
At/À : Scale model/Maquette > new sélections added/nouvelles sélections rajoutées :
> Photos Scale model/Photos de la maquette
>Video presentation Mother Meera/Vidéo présentation Mère Meera
Text and video added/Texte et vidéo rajoutés.
JULY 28, 2022 – 28 JUILLET 2022
Replace de following for updated plans/Remplacer les plans suivants pour des plus récents :
At/À : Plans > Sports Center/Centre sportif > Basement/Sous-sol > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_BASEMENT_JULY 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > First level/Premier niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FIRST LEVEL_JULY 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > Second level/Deuxième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_SECOND LEVEL_JULY 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > Third level/Troisième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_THIRD LEVEL_JULY 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > Fourth level/Quatrième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FOURTH LEVEL_JULY 24, 2022.pdf
JULY 24, 2022 – 24 JUILLET 2022
At/À : Project Planning/Planification > Design progression/Progression conceptual — Progression achievement chart updated/Tableau d’accomplissement progressif mis à jour.
JULY 6, 2022 – 6 JUILLET 2022
At/À : Geothermal/Géothermie — Selection moved to next level and replaced by/La selection est déménagée au prochain niveau et remplacée par : > Energy management/Gestion de l’énergie – next level selections/selections au niveau suivant :
> Electrical energy/Énegie électrique
> Solar energy/Énergie solaire
> Geothermal/Géothermie
JUNE 7, 2022 – 7 JUIN 2022
At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER RECYCLING PATH_JUNE 5, 2022.pdf added/rajouté.
JUNE 1, 2022 – 1 JUIN 2022
At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau (added/rajouté) and/et :
At/à : Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER CYCLE_MAY 28, 2022.pdf – added/rajouté.
APRIL 21, 2022 – 21 AVRIL 2022
At/à : Water management/Gestion de l’eau > Rainwater treatment/Traitement de l’eau de pluie > Détailed plans/Plans détaillés : New plans added/Nouveaux plans rajoutés : WATER MANAGEMENT_POTABLE WATER SYSTEM_FEB 24, 2022.pdf
Et/and : WATER MANAGEMENT_SWIMMING POOL WATER TREATMENT SYSTEM_FEB 24, 2022.pdf
APRIL 19, 2022 – 19 AVRIL 2022
At/à : Housing/Habitation > Image and text added/image et texte rajouté.
APRIL 18, 2022 – 18 AVRIL 2022
At/à : Plans > Garage & Engineering/Garage & Ingénierie (new selection/nouvelle sélection) : New plans for architecture – structure – elevation added/Nouveaux plans d’architecture – structure – élévation rajoutés.
APRIL 14, 2022 – 14 AVRIL 2022
At/À : Home/Accueil > New selection added for CLIMATE, opening to a new page for climate conditions throughout the year at Madanapalle/Nouvelle selection rajoutée pour le CLIMAT, ouvrant une nouvelle page pour les conditions climatiques durant l’année à Madanapalle.
APRIL 10, 2022 – 10 AVRIL 2022
At/À : Home/Accueil > A gifts from Mother (photo and text) moved from the Home page to the horizontal selection bar / Un Cadeau de Mère (photo et texte) déménagé de la page d’accueil vers la sélection horizontale.
MARCH 11, 2022 – 11 MARS 2022
At/à : Plans > Sports center/Centre sportif > Basement/Sous-sol > Footing – Empattement : Replace existing plan by/Remplacer le plan existant par:
SPORTS CENTER_STRUCTURE_BASEMENT FOOTINGS & COLUMNS_FEB 16, 2022.pdf
At/à : Plans > Sports center/Centre sportif > First level/Premier niveau > Structure : Replace existing plan by/Remplacer le plan existant par :
SPORTS CENTER_STRUCTURE_1 ST LEVEL POOL FOOTINGS, BEAMS & COLUMNS_MARCH 6, 2022.pdf
At/à : Plans > Sports center/Centre sportif > Second level/Deuxième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_2 ND LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf
At/à : Plans > Sports center/Centre sportif > Third level/Troisième niveau > Structure : Replace existing plan by/Remplacer le plan existant par :
SPORTS CENTER_STRUCTURE_3 RD LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf
At/à : Plans > Sports center/Centre sportif > Fourth level/Quatrième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_4 TH LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf
At/à : Plans > Sports center/Centre sportif > Roof/Toiture > Structure : Replace existing plan by/Remplacer le plan existant par :
SPORTS CENTER_STRUCTURE_ROOF BEAMS_MARCH 6, 2022.pdf
MARCH 9, 2022 – 9 MARS 2022
At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Front view of third support wall structure : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_FRONT VIEW OF THIRD SUPPORT WALL_FEB 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – left side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_LEFT SIDE_FEB 24, 2022.pdf
At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – right side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_RIGHT SIDE_FEB 24, 2022.pdf
MARCH 1, 2022 – 1 MARS 2022
At/À : Home/Accueil > A gifts from Mother added (photo and text)/Un Cadeau de Mère ajouté (photo et texte)
FEB 23, 2022 – 23 FÉV 2022
At/À : Plans > College/Collège > Construction details/Détails de construction : plans added/plans rajoutés :
- COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS-FRONT VIEW_FEB 15, 2022
- COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS- SIDE VIEW
- COLLEGE_CONSTRUCTION DETAILS_CLASSROOMS_FEB 23, 2022
FEB 22, 2022 – 22 FÉV 2022
At/À : Plans > Trades School/École des Métiers > First floor/Premier étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_FIRST FLOOR COLUMNS & BEAMS_FEB 13, 2022
At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_SECOND FLOOR COLUMNS & BEAMS_FEB 13, 2022
At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_THIRD FLOOR COLUMNS & BEAMS_FEB 13, 2022
At/À : Plans > Trades School/École des Métiers > Basement/Sous-sol > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_BASEMENT FOOTING & COLUMNS_FEB 13, 2022
At/À : Plans > Trades School/École des Métiers > Roof/Toiture > Structure : New plan added/Nouveau plan rajouté: TRADES SCHOOL_STRUCTURE_ROOF BEAMS STRUCTURE_FEB 14, 2022
FEB 20, 2022 – 20 FÉV 2022
At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_SECOND FLOOR_FEB 14, 2022
At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_THIRD FLOOR_FEB 14, 2022
At/À : Plans > Trades School/École des Métiers > Sous-sol/Basement > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_BASEMENT_FEB 14, 2022
JAN 23, 2022 – 23 JAN 2022
At/À : > Home
Citations & pictures of Mother Meera added
Citations et photos de Mère Meera rajoutées
JAN 20, 2022 – 20 JAN 2022
At/À : > Home
A train of images added : About Madanapalle
Un train d’images rajoutés : À propos de Madanapalle
JAN 6, 2022 – 6 JAN 2022
YouTube videos added/Vidéos YouTube rajoutées :
Mother Meera School (Par-1) – Jan 24, 2020 – 18.08 min
https://www.youtube.com/watch?v=A4N9LIALtAo
Mother Meera & Mother Mirra. – YouTube – 5.36 min.
https://www.youtube.com/watch?v=oXiWCE-8qLo
Mother Meera on Covid-19 - YouTube – 2.57 min. – Aug 11, 2021
https://www.youtube.com/watch?v=sE5yIlMei2A
MahaMaya – Mother Meera – 4.34 min – March 2020
https://www.youtube.com/watch?v=siaKCp9ekXY
La lumière blanche – The white light – Mother Meera – 11.28 min
https://www.youtube.com/watch?v=YLcNes67WRY
Ascent & Descent – Ascension & Descente – Mère Meera – 15.12 min.
https://www.youtube.com/watch?v=z63ytZranc8
What is God? – Mother Meera answers 1, Seg 1 – 47.07 min
https://www.youtube.com/watch?v=yOeV0nmycws
The Divine Light – Mother Meera Answers 1, Seg 2 – 48.02 min
https://www.youtube.com/watch?v=0K0EKcZ8Byg
True Visions – Mother Meera Answers 1, Seg 3 – 48.01 min
https://www.youtube.com/watch?v=1oXYdZBuFVc
What is Love? – Mother Meera Answers 1, Seg 4 – 37.54 min
https://www.youtube.com/watch?v=aDsk88OPxbk
Colors of Love – Darshan of Mother Meera – 14.44 min
https://www.youtube.com/watch?v=-s1u5HmXX4Q
Mother Meera – 6.28 min
https://www.youtube.com/watch?v=2m86MEQXgZk
DEC 31, 2021 – 31 DÉC 2021
At/À : > Foundation/Fondation
🔷 Information :
Revised pictures/Images révisées
Text revised : Why a Foundation – revised
Texte révisé : Pourquoi une Fondation
Text added : Necessary obligations to create and operate a registered non-profit Foundation
Texte rajouté : Exigences nécesaires à la création et à l’opération d’une Fondation OSBL enregistrée
Text added : Managing a Non-profit Organization
Texte rajouté : Gestion d’un Organisme OSBL
SEPT 23 2021 – 23 SEPT 2021
At/à : > Project volunteers/Bénévoles
- Work at home/Travail à la maison
- - Electrotechnical engineering ̶ Ingénierie Electro-technique
Text added/Texte rajouté : Electrotechnical Engineering.docx
AUGUST 31, 2021 – 31 AOÛT 2021
At/À: Project volunteers/Bénévoles > Small personal project/Petit projet personnel > At/À : Small personal project description/Description de petit projet personnel,
- Academic classroom design – Conception de classe académique
Image and text added/Image et texte ajoutés.
At/À : Sports Center/Centre Sportif > Third level/Troisième niveau
Change in sélections/Changement de sélections
- Information
- Auditoriums
- Game watch mezzanine/Mezzanine d’observation
- Restrooms/Salles de toilettes
At/À : Sports Center/Centre Sportif > Third level/Troisième niveau
- Auditoriums : Image and text added/Image et texte ajoutés
AUGUST 30, 2021 – 30 AOÛT 2021
At/À: Project volunteers/Bénévoles
Another selection added :
- Work at home/Travail à la maison
- Work on site/Travail en chantier
- Small personal project/Petit projet personnel (added selection)
At/À: > Small personal project/Petit projet personnel
Image and text added/Image et texte rajoutés
AUGUST 22, 2021 – 22 AOÛT 2021
At/À : Scale Model/Maquette > Professional photos of the Sports Center, the College and the Trades School added/Photos professionnelles du Centre Sportif, du Collège et de l’École des Métiers rajoutées.
AUGUST 22, 2021 – 22 AOÛT 2021
At/À : Project volunteers/Bénévoles > Small personal project/Petit projet personnel (new selection added/nouvelle selection rajoutée)
MAI 28, 2021 – 28 MAI 2021
At/à : Home : Image of the City College changed with a professional photo /L’image de la Cité Collégiale change avec une photo professionnelle. (City College_PAN_ISA.Jpg)
Same photo added at/Même chose à : City College/Cité Collégiale
And the same photo has been added
At > Scale Model (at the top of the pictures)/La même photo a été rajoutée à : /Maquette (au tout début des images).
APRIL 24, 2021 – 24 AVRIL 2021
At/à : Sports Center/Centre sportif > First level/Premier niveau > Swimming pool/Piscine > Air treatment/Traitement de l’air – Add text/rajouter le texte :
Air and humidity treatment/Traitement de l’air et de l’humidité.
MARCH 24, 2021 – 24 MARS 2021
At/à : Project Planning/Planification > Design progression/Progression conceptuelle : Achievement chart updated /Tableau d’accomplissement mis à jour.
MARCH 4, 2021 – 4 MARS 2021
At/à : Sports Center/Centre sportif > Basement/Sous-sol : New plan added/Nouveau plan rajouté.
Sports Center_Architecture_Basement level & Water Treatment Systems
Same plan added at : Plumbing & Water Treatment Systems/Plomberie & Systèmes de traitement de l’eau.
At/à : Sports Center/Centre sportif > First Level/Premier niveau > Architecture plan updated/Plan d’architecture révisé :
Sports Center/Centre Sportif_ Architecture_First level_March 2, 2021
At/à : Sports Center/Centre sportif > Second Level/Deuxième niveau > Architecture_Plan updated :
Sports Center_Architecture_Second level_March 2, 2021
At/à : Sports Center/Centre sportif > Third Level/Troisième niveau > Architecture plan updated/Plan d’architecture révisé :
At/à : Sports Center/Centre sportif > Fourth Level/Quatrième niveau > Architecture plan updated/Plan d’architecture révisé :
Sports Center_Architecture_Fourth level_March 2, 2021
At/à : Sports Center/Centre sportif > Roof level/Niveau toiture > New Architecture plan added/Nouveau plan d’architecture :
Sports Center_Architecture_Roof level_March 2, 2021
And/et :
At/à : Trades school/École des métiers > elevation/élévation : New plan added/Nouveau plan rajouté :
Trades school_Elevation_View of workshop inside wall_Feb 19, 2021
FEBUARY 15, 2021 – 15 FÉVRIER 2021
At/à : Sports Center/Centre Sportif > First level/Premier niveau > Information > Add image of pool/rajouter l’image de la piscine
And/et : Text/Texte : Olympic Swimming Pool/Piscine Olympique.
FEBUARY 11, 2021 – 11 FÉVRIER 2021
At/à : New plans/Nouveaux plans.
- Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS LEFT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS LEFT RESTROOM_FEB 1, 2021
And/et
At/à : > Sports Center/Centre sportif
- Fourth level/Quatrième niveau
- Gym fitness/Conditionnement physique (New selection/nouvelle sélection)
- Image and text added/Image et texte rajouté
- Text/Texte : Physical activities in education/Activité physique en éducation.
FEBUARY 6, 2021 – 6 FÉVRIER 2021
At/à ; New plans/Nouveaux plans.
- Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS LEFT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS LEFT RESTROOM_FEB 1, 2021
And/et
At/à ; New plans/Nouveaux plans.
- Plans > Sports Center > First level > Plumbing > POOL_BOYS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > POOL_BOYS LEFT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > POOL_GIRLS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > First level > Plumbing > POOL_GIRLS LEFT RESTROOM_FEB 1, 2021
And/et
FEBUARY 5, 2021 – 5 FÉVRIER 2021
At/à ; New plans/Nouveaux plans.
- Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS LEFT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS LEFT RESTROOM_FEB 1, 2021
And/et
At/à ; New plans/Nouveaux plans.
- Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS LEFT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS RIGHT RESTROOM_FEB 1, 2021
- Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS LEFT RESTROOM_FEB 1, 2021
- And/et
FEBUARY 3, 2021 – 3 FÉVRIER 2021
At/à ; New plans/Nouveaux plans.
- Plans > Trades school > First floor > Plumbing
- Plans > Trades school > Second floor > Plumbing
- Plans > Trades school > Third floor > Plumbing
FEBUARY 2, 2021 – 2 FÉVRIER 2021
At/à : Plans > College/Collège > First floor/Premier étage > Plumbing/Plomberie : New plans added/nouveaux plans rajoutés
- College_First floor_Plumbing_Boys restrooms_Feb 1, 2021
- College_First floor_Plumbing_Girls restrooms_Feb 1, 2021
- College_First floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
And/et
- College_Second floor_Plumbing_Boys restrooms_Feb 1, 2021
- College_Second floor_Plumbing_Girls restrooms_Feb 1, 2021
- College_Second floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
And/et
- College_Third floor_Plumbing_Boys restrooms_Feb 1, 2021
- College_Third floor_Plumbing_Girls restrooms_Feb 1, 2021
- College_Third floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
- College_Third floor_Plumbing_Showers_Feb 1, 2021
- And/et
- College_Fourth floor_Plumbing_Boys restrooms_Feb 1, 2021
- College_Fourth floor_Plumbing_Girls restrooms_Feb 1, 2021
- College_Fourth floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
- College_Fourth floor_Plumbing_Showers_Feb 1, 2021
JANUARY 29, 2021 – 29 JANVIER 2021
New plans added/Nouveaux plans rajoutés :
At/à : Plans > Trades school > Structure > Basement footings
And/et
At/à : Plans > Trades school > First floor > Footing > Footings & columns
Plans > Trades school > Second floor > Structure > Columns & Beams
Plans > Trades school > Third floor > Structure > Columns & Beams
JANUARY 27, 2021 – 27 JANVIER 2021
At/à : Project volunteers/Bénévoles
- Work at home/Travail à la maison
- Institutional architecture/Architecture institutionnelle
- New text added/Nouveau texte rajouté
And/et :
At/à : Water management/Gestion de l’eau >
- Rainwater harvest/Collecte eau de pluie
- Detailed plans/Plans détaillés
- New plan added/Nouveau plan rajouté
- Rainwater harvest columns characteristics
JANUARY 26, 2021 – 26 JANVIER 2021
At/à : Water management/Gestion de l’eau >
Rainwater treatment/Traitement de l’eau de pluie >
Text added/texte rajouté : Rainwater Harvesting – Treatment process.
And/et :
At/à : Water management / Gestion de l’eau
- Rainwater harvesting / Collecte eau de pluie
- Detailed plans/Plans détaillés
- New drawing added/Rajout d’un nouveau dessin
- Rainwater Harvest Flow into columns & pre-filters.
And/et :
At/à : Water management / Gestion de l’eau
- New selection added/Nouvelle selection rajoutée.
- Stormwater treatment/Traitement eau d’orage
JANUARY 25, 2021 – 25 JANVIER 2021
At/à : Project planning/Planification du projet
- Design progression/Progression conceptuelle
- Development chart updated/Tableau de développement mis à jour.
JANUARY 23, 2021 – 23 JANVIER 2021
At/à : Water management/Gestion de l’eau >
Rainwater treatment/Traitement de l’eau de pluie >
Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.
And/et :
At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >
Gymnase glass walls (new selection – New plan/Nouvelle selection – Nouveau plan.
And/et :
At/à : Water management/Gestion de l’eau >
Rainwater harvest/Collecte eau de pluie >
Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.
JANUARY 21, 2021 – 21 JANVIER 2021
At/à : Plans > Sports Center/Centre Sportif > Third level/Troisième niveau > Steel beams auditorium floor – New plan/Nouveau plan.
And/et
At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >
Inside view of front wall (new selection – New plan/Nouvelle selection – Nouveau plan.
JANUARY 19, 2021 – 19 JANVIER 2021
At/à : Water management / Gestion de l’eau
- Rainwater harvesting / Collecte eau de pluie
- Image and text added / Image et teste rajoutée
At/à : Water management / Gestion de l’eau
- Rainwater treatment / Traitement eau de pluie
- Image added / Image rajoutée
At/à : Water management / Gestion de l’eau
- Wastewater treatment / Traitement de l’eau usée
Image added / Image rajoutée
JANUARY 18, 2021 – 18 JANVIER 2021
At/à : Plans > Sports Center/Centre Sportif > Structure > Second level/Deuxième niveau – Revised plan/Plan révisé.
JANUARY 17, 2021 – 17 JANVIER 2021
At/à : Plans > Sports Center/Centre Sportif > Second level/Deuxième niveau > Court markings – New plan added/Nouveau plan rajouté.
And/et
At/à : Vertical selection : Rainwater/Eau de pluie, changed for/Changé pour : Water management /Gestion de l’eau
And at/et à :Water management /Gestion de l’eau > add new sélections/rajouter les nouvelles sélections :
Rainwater harvesting/Collecte eau de pluie
Rainwater treatment/Traitement eau de pluie
Wastewater treatment/Traitement eau usée
And/et
At/à : Construction site/Site de construction > New plan added/Nouveau plan rajouté.
At/à : Plans > Sports Center/Centre Sportif > Architecture > Second level/Deuxième niveau – Plan revised/Plan révisé.
And/et
At/à : Plans > Sports Center/Centre Sportif > Structure > First level/Premier niveau – Footings/Empattement > New plan/Nouveau plan.
JANUARY 12, 2021 – 12 JANVIER 2021
At/à : Plans > Sports Center/Centre Sportif > Structure > Third level/Troisième niveau – New plan/Nouveau plan.
And/et
At/à : Plans > Sports Center/Centre Sportif > Structure > Fourth level/quatrième niveau – New plan/Nouveau plan.
And/et
At/à : Plans > Sports Center/Centre Sportif > Structure > Roof /Toiture –
New selection/Nouvelle sélection – New plan/Nouveau plan.
And/et
At/à : Plans > College/Collège > Roof /Toiture
New selection/Nouvelle sélection
And/et
At/à : Plans > Trades school/École des Métiers > Roof /Toiture
New selection/Nouvelle sélection
At/à : Latest updates/Dernières mises à jour
Reversed scroll down for previous updates/
Déroulement inversé pour les mises à jours antérieures.
JANUARY 11, 2021 – 11 JANVIER 2021
At/à : Plans > Sports Center/Centre Sportif > Architecture > Third level/Troisième niveau – Plan revised/Plan révisé.