2020 09 01 at 09 53 51

 


  LATEST UPDATES – DERNIÈRES MISES À JOUR – FEBUARY 5, 2024

ON/SUR

MOTHERMEERAFUTURECOLLEGE.ORG WEBSITE

 

FEBUARY 5, 2024 – 5 FÉVRIER 2024

At: Energy Management / Solar Energy : Solar Installations.jpg and text:

Solar Energy (2).docx - added

À : Gestion de l’Énergie / Énergie Solaire : Solar Installations.jpg et le texte : L’Énergie Solaire (2).docx - rajoutés

At : Technical Service Center : image added : Technical Service Center (5f).jpg

À : Centre de Services Techniques : image rajoutée : Technical Service Center (5f).jpg

FEBUARY 4, 2024 – 4 FÉVRIER 2024

At: Energy Management / Solar Energy / Diagram (new selection) added and : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - added

À: Gestion de l’Énergie / Énergie Solaire / Diagramme (nouvel onglet) rajouté et le plan : POWER MANAGEMENT_PHOTOVOLTAIC SOLAR SYSTEM_OCT 19, 2022.pdf - rajouté.

FEBUARY 3, 2024 – 3 FÉVRIER 2024

At : Energy management / - Geothermal : the sub-selection - Diagram is added and the plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - is added.

À : Gestion de l’énergie / - Géothermie : le sous-onglet - Diagramme, est rajouté et le plan : GEOTHERMAL_FUNCIONAL DIAGRAM FOR TURBO HEAT PUMP_JAN 5, 2024 - est rajouté.

FEBUARY 2, 2024 – 2 FÉVRIER 2024

At: Housing / 2 new sub-selections added: - On campus, and - Off campus

The sub-selections - Teachers Residence and - Students Residence, are moved as a sub-selection under - On campus

Under the sub-selection - Teachers Residence: the illustration of the Teachers Residence and the text is added

and, under - Students Residence: The illustration of the Students Residence and the text is added.

The illustration and the text under the selection - Housing / is moved under the selection - Off campus.

À : Habitation / deux sous-onglets sont rajoutés : - Sur le campus, et

- Hors campus. Les sous-onglets - Résidence Prof et - Résidence étudiantes, sont déplacés sous le sous-onglet : Sur le campus.

Sous l’onglet - Résidences Prof : l’illustration de la Résidence Prof et le texte sont rajoutés. De même que pour la Résidence étudiants.

L’illustration sous l’onglet - Habitation : est déplacé sous l’onglet - Hors campus.

DECEMBER 20, 2023 – 20 DÉCEMBRE 2023

At : Plans / Campus Infrastructure / Campus Layout Version 1: Plan revised / Plan revue.

JULY 9, 2023 – 9 JUILLET 2023

At : Plans / Teachers Residence / First floor / Architecture /

TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.

Plans / Teachers Residence / Second/Fifth floors / Architecture /

TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.

Plans / Teachers Residence / Façade / TEACHERS RESIDENCE FAÇADE FRONT WING ELEVATION / TEACHERS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.

At : Plans / Students Residence / First floor / Architecture /

STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - new plan added.

Plans / Students Residence / Second/Fifth floors / Architecture /

STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - new plan added.

Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - new plan added.

Plans / Students Residence / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - new plan added.

À : Plans / Résidence des professeurs / Premier niveau / Architecture /

TEACHERS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.

Plans / Résidence des professeurs / Niveaux 2, 3, 4, 5 / Architecture /

TEACHERS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.

Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.

Plans / Résidence des professeurs / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.

À : Plans / Résidence étudiants / Premier niveau / Architecture /

STUDENTS RESIDENCE_FIRST FLOOR_MAY 17, 2023.pdf - nouveau plan.

Plans / Résidence étudiants / Niveaux 2, 3, 4, 5 / Architecture /

STUDENTS RESIDENCE_FLOORS 3, 4, 5_MAY 24, 2023.pdf - nouveau plan.

Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE FRONT WING ELEVATION /

STUDENTS RESIDENCE_FACADE FRONT WING ELEVATION_MAY 17, 2023 - nouveau plan.

Plans / Résidence étudiants / Façade / STUDENTS RESIDENCE FAÇADE LEFT WING ELEVATION /

STUDENTS RESIDENCE_FACADE LEFT WING ELEVATION_MAY 17, 2023 - nouveau plan.

 

JULY 1, 2023 – 1 JUILLET 2023

New sub-selection (Housing/Habitation) added at : Plans. Sub-selections (Teachers residence) and (Students residence) added at Housing/Habitation.

Nouvel onglet (Housing/Habitation) rajouté à : Plans. Sous-onglets (Teachers residence) et (Students residence) added at Housing/Habitation.

JUNE 26, 2023 – 26 JUIN 2023

New selection “MANAGEMENT” added at : City College

New selection added at : “MANAGEMENT” for “OPERATIONAL ORGANIGRAM” and “CITY COLLEGE_OPERATIONAL ORGANIGRAM_APRIL 28, 2023.pdf” added.

Nouvel onglet « GESTION » rajouté à : Cité Collégiale

Nouvel onglet ajouté à : « GESTION » pour « ORGANIGRAMME OPÉRATIONNEL » et le dessin « LA CITÉ COLLÉGIALE_ORGANIGRAMME OPÉRATIONNEL_24 MAI 2023.pdf ajouté.

JUNE 26, 2023 – 26 JUIN 2023

New selection “Campus infrastructure” added at : Plans

At “Campus infrastructure”, “Campus layout version 1’’ added.

Nouvel onglet « Campus infrastructure » rajouté à : Plans.

À l’onglet « Campus infrastructure », Campus layout version 1 » rajouté.

NOVEMBER 20, 2022 – 13 NOVEMBRE 2022

At : Electrical Power Station Add /À : Centrale Électrique rajouté :

ELECTRIC POWER STATION_BLOC DIAGRAM_OCT 19, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_BASEMENT_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_1ST FLOOR_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_2ND FLOOR_OCT 14, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_3RD FLOOR_OCT 18, 2022.pdf

ELECTRIC POWER STATION_ARCHITECTURE_ROOF_OCT 18, 2022.pdf

NOVEMBER 13, 2022 – 13 NOVEMBRE 2022

At/À : Add new selection : Electrical Power Station/Centrale Électrique

SEPTEMBER 6, 2022 – 6 SEPTEMBRE 2022

At/À : Plans > Trades school/École des Métiers > Basement/Sous-sol > Electrical/Électrique > New electrical plans added/Nouveaux plans électriques rajoutés (Electrical items, their locations and the wiring schedule)/(Fixtures électriques, leur localisation et le schéma de filage).

The same for the 1st, 2nd, and 3rd floors/De même pour les 1er, 2ième et 3ième étages.

AUGUST 6, 2022 – 6 AOÛT 2022

At/À : Scale model/Maquette > new sélections added/nouvelles sélections rajoutées :

> Photos Scale model/Photos de la maquette

>Video presentation Mother Meera/Vidéo présentation Mère Meera

Text and video added/Texte et vidéo rajoutés.

JULY 28, 2022 – 28 JUILLET 2022

Replace de following for updated plans/Remplacer les plans suivants pour des plus récents :

At/À : Plans > Sports Center/Centre sportif > Basement/Sous-sol > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_BASEMENT_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > First level/Premier niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FIRST LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Second level/Deuxième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_SECOND LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Third level/Troisième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_THIRD LEVEL_JULY 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Fourth level/Quatrième niveau > Architecture> Replace drawing for/Remplacer le dessin pour: SPORTS CENTER_ARCHITECTURE_FOURTH LEVEL_JULY 24, 2022.pdf

JULY 24, 2022 – 24 JUILLET 2022

At/À : Project Planning/Planification > Design progression/Progression conceptual — Progression achievement chart updated/Tableau d’accomplissement progressif mis à jour.

JULY 6, 2022 – 6 JUILLET 2022

At/À : Geothermal/Géothermie — Selection moved to next level and replaced by/La selection est déménagée au prochain niveau et remplacée par : > Energy management/Gestion de l’énergie – next level selections/selections au niveau suivant :

> Electrical energy/Énegie électrique

> Solar energy/Énergie solaire

> Geothermal/Géothermie

JUNE 7, 2022 – 7 JUIN 2022

At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER RECYCLING PATH_JUNE 5, 2022.pdf added/rajouté.

JUNE 1, 2022 – 1 JUIN 2022

At/À : Water management/Gestion de l’eau > Water cycle/Cycle de l’eau (added/rajouté) and/et :

At/à : Water cycle/Cycle de l’eau > WATER MANAGEMENT_WATER CYCLE_MAY 28, 2022.pdf – added/rajouté.

APRIL 21, 2022 – 21 AVRIL 2022

At/à : Water management/Gestion de l’eau > Rainwater treatment/Traitement de l’eau de pluie > Détailed plans/Plans détaillés : New plans added/Nouveaux plans rajoutés : WATER MANAGEMENT_POTABLE WATER SYSTEM_FEB 24, 2022.pdf

Et/and : WATER MANAGEMENT_SWIMMING POOL WATER TREATMENT SYSTEM_FEB 24, 2022.pdf

APRIL 19, 2022 – 19 AVRIL 2022

At/à : Housing/Habitation > Image and text added/image et texte rajouté.

APRIL 18, 2022 – 18 AVRIL 2022

At/à : Plans > Garage & Engineering/Garage & Ingénierie (new selection/nouvelle sélection) : New plans for architecture – structure – elevation added/Nouveaux plans d’architecture – structure – élévation rajoutés.

APRIL 14, 2022 – 14 AVRIL 2022

At/À : Home/Accueil > New selection added for CLIMATE, opening to a new page for climate conditions throughout the year at Madanapalle/Nouvelle selection rajoutée pour le CLIMAT, ouvrant une nouvelle page pour les conditions climatiques durant l’année à Madanapalle.

APRIL 10, 2022 – 10 AVRIL 2022

At/À : Home/Accueil > A gifts from Mother (photo and text) moved from the Home page to the horizontal selection bar / Un Cadeau de Mère (photo et texte) déménagé de la page d’accueil vers la sélection horizontale.

 

MARCH 11, 2022 – 11 MARS 2022

At/à : Plans > Sports center/Centre sportif > Basement/Sous-sol > Footing – Empattement : Replace existing plan by/Remplacer le plan existant par:

SPORTS CENTER_STRUCTURE_BASEMENT FOOTINGS & COLUMNS_FEB 16, 2022.pdf

At/à : Plans > Sports center/Centre sportif > First level/Premier niveau > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_1 ST LEVEL POOL FOOTINGS, BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Second level/Deuxième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_2 ND LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Third level/Troisième niveau > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_3 RD LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Fourth level/Quatrième niveau > Structure : Replace existing plan by/Remplacer le plan existant par : SPORTS CENTER_STRUCTURE_4 TH LEVEL BEAMS & COLUMNS_MARCH 6, 2022.pdf

At/à : Plans > Sports center/Centre sportif > Roof/Toiture > Structure : Replace existing plan by/Remplacer le plan existant par :

SPORTS CENTER_STRUCTURE_ROOF BEAMS_MARCH 6, 2022.pdf

MARCH 9, 2022 – 9 MARS 2022

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Front view of third support wall structure : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_FRONT VIEW OF THIRD SUPPORT WALL_FEB 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – left side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_LEFT SIDE_FEB 24, 2022.pdf

At/À : Plans > Sports Center/Centre sportif > Elevation/Élévation > Elevation structure – right side : Plan updated and changed by/Plan mis à jour et changé par : SPORTS CENTER_ELEVATION_RIGHT SIDE_FEB 24, 2022.pdf

MARCH 1, 2022 – 1 MARS 2022

At/À : Home/Accueil > A gifts from Mother added (photo and text)/Un Cadeau de Mère ajouté (photo et texte)

FEB 23, 2022 – 23 FÉV 2022

At/À : Plans > College/Collège > Construction details/Détails de construction : plans added/plans rajoutés :

  • COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS-FRONT VIEW_FEB 15, 2022
  • COLLEGE_STRUCTURE_TYPICAL FLOOR DETAILS- SIDE VIEW
  • COLLEGE_CONSTRUCTION DETAILS_CLASSROOMS_FEB 23, 2022

FEB 22, 2022 – 22 FÉV 2022

At/À : Plans > Trades School/École des Métiers > First floor/Premier étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_FIRST FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_SECOND FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_THIRD FLOOR COLUMNS & BEAMS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Basement/Sous-sol > Structure : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_STRUCTURE_BASEMENT FOOTING & COLUMNS_FEB 13, 2022

At/À : Plans > Trades School/École des Métiers > Roof/Toiture > Structure : New plan added/Nouveau plan rajouté: TRADES SCHOOL_STRUCTURE_ROOF BEAMS STRUCTURE_FEB 14, 2022

FEB 20, 2022 – 20 FÉV 2022

At/À : Plans > Trades School/École des Métiers > Second floor/Deuxième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_SECOND FLOOR_FEB 14, 2022

At/À : Plans > Trades School/École des Métiers > Third floor/Troisième étage > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_THIRD FLOOR_FEB 14, 2022

At/À : Plans > Trades School/École des Métiers > Sous-sol/Basement > Architecture : Plan updated and replaced by/Plan mis à jour et remplacé par : TRADES SCHOOL_ARCHITECTURE_BASEMENT_FEB 14, 2022

JAN 23, 2022 – 23 JAN 2022

At/À : > Home

Citations & pictures of Mother Meera added

Citations et photos de Mère Meera rajoutées

JAN 20, 2022 – 20 JAN 2022

At/À : > Home

A train of images added : About Madanapalle

Un train d’images rajoutés : À propos de Madanapalle

 

JAN 6, 2022 – 6 JAN 2022

YouTube videos added/Vidéos YouTube rajoutées :

Mother Meera School (Par-1) – Jan 24, 2020 – 18.08 min

https://www.youtube.com/watch?v=A4N9LIALtAo

Mother Meera & Mother Mirra. – YouTube – 5.36 min.

https://www.youtube.com/watch?v=oXiWCE-8qLo

Mother Meera on Covid-19 - YouTube – 2.57 min. – Aug 11, 2021

https://www.youtube.com/watch?v=sE5yIlMei2A

MahaMaya – Mother Meera – 4.34 min – March 2020

https://www.youtube.com/watch?v=siaKCp9ekXY

La lumière blanche – The white light – Mother Meera – 11.28 min

https://www.youtube.com/watch?v=YLcNes67WRY

Ascent & Descent – Ascension & Descente – Mère Meera – 15.12 min.

https://www.youtube.com/watch?v=z63ytZranc8

What is God? – Mother Meera answers 1, Seg 1 – 47.07 min

https://www.youtube.com/watch?v=yOeV0nmycws

The Divine Light – Mother Meera Answers 1, Seg 2 – 48.02 min

https://www.youtube.com/watch?v=0K0EKcZ8Byg

True Visions – Mother Meera Answers 1, Seg 3 – 48.01 min

https://www.youtube.com/watch?v=1oXYdZBuFVc

What is Love? – Mother Meera Answers 1, Seg 4 – 37.54 min

https://www.youtube.com/watch?v=aDsk88OPxbk

Colors of Love – Darshan of Mother Meera – 14.44 min

https://www.youtube.com/watch?v=-s1u5HmXX4Q

Mother Meera – 6.28 min

https://www.youtube.com/watch?v=2m86MEQXgZk

 

DEC 31, 2021 – 31 DÉC 2021

At/À : > Foundation/Fondation

🔷 Information :

Revised pictures/Images révisées

 

Text revised : Why a Foundation – revised

Texte révisé : Pourquoi une Fondation

 

Text added : Necessary obligations to create and operate a registered non-profit Foundation

Texte rajouté : Exigences nécesaires à la création et à l’opération d’une Fondation OSBL enregistrée

 

Text added : Managing a Non-profit Organization

Texte rajouté : Gestion d’un Organisme OSBL

 

SEPT 23 2021 – 23 SEPT 2021

At/à : > Project volunteers/Bénévoles

  • Work at home/Travail à la maison
  • - Electrotechnical engineering ̶ Ingénierie Electro-technique

Text added/Texte rajouté : Electrotechnical Engineering.docx

 

AUGUST 31, 2021 – 31 AOÛT 2021

At/À: Project volunteers/Bénévoles > Small personal project/Petit projet personnel > At/À : Small personal project description/Description de petit projet personnel,

- Academic classroom design – Conception de classe académique

Image and text added/Image et texte ajoutés.

At/À : Sports Center/Centre Sportif > Third level/Troisième niveau

Change in sélections/Changement de sélections

  • Information
  • Auditoriums
  • Game watch mezzanine/Mezzanine d’observation
  • Restrooms/Salles de toilettes

At/À : Sports Center/Centre Sportif > Third level/Troisième niveau

  • Auditoriums : Image and text added/Image et texte ajoutés

AUGUST 30, 2021 – 30 AOÛT 2021

At/À: Project volunteers/Bénévoles

Another selection added :

  • Work at home/Travail à la maison
  • Work on site/Travail en chantier
  • Small personal project/Petit projet personnel (added selection)

At/À: > Small personal project/Petit projet personnel

Image and text added/Image et texte rajoutés

AUGUST 22, 2021 – 22 AOÛT 2021

At/À : Scale Model/Maquette > Professional photos of the Sports Center, the College and the Trades School added/Photos professionnelles du Centre Sportif, du Collège et de l’École des Métiers rajoutées.

AUGUST 22, 2021 – 22 AOÛT 2021

At/À : Project volunteers/Bénévoles > Small personal project/Petit projet personnel (new selection added/nouvelle selection rajoutée)

MAI 28, 2021 – 28 MAI 2021

At/à : Home : Image of the City College changed with a professional photo /L’image de la Cité Collégiale change avec une photo professionnelle. (City College_PAN_ISA.Jpg)

Same photo added at/Même chose à : City College/Cité Collégiale

And the same photo has been added

At > Scale Model (at the top of the pictures)/La même photo a été rajoutée à : /Maquette (au tout début des images).

APRIL 24, 2021 – 24 AVRIL 2021

At/à : Sports Center/Centre sportif > First level/Premier niveau > Swimming pool/Piscine > Air treatment/Traitement de l’air – Add text/rajouter le texte :

Air and humidity treatment/Traitement de l’air et de l’humidité.

MARCH 24, 2021 – 24 MARS 2021

At/à : Project Planning/Planification > Design progression/Progression conceptuelle : Achievement chart updated /Tableau d’accomplissement mis à jour.

 

MARCH 4, 2021 – 4 MARS 2021

At/à : Sports Center/Centre sportif > Basement/Sous-sol : New plan added/Nouveau plan rajouté.

Sports Center_Architecture_Basement level & Water Treatment Systems

Same plan added at : Plumbing & Water Treatment Systems/Plomberie & Systèmes de traitement de l’eau.

At/à : Sports Center/Centre sportif > First Level/Premier niveau > Architecture plan updated/Plan d’architecture révisé :

Sports Center/Centre Sportif_ Architecture_First level_March 2, 2021

At/à : Sports Center/Centre sportif > Second Level/Deuxième niveau > Architecture_Plan updated :

Sports Center_Architecture_Second level_March 2, 2021

At/à : Sports Center/Centre sportif > Third Level/Troisième niveau > Architecture plan updated/Plan d’architecture révisé :

At/à : Sports Center/Centre sportif > Fourth Level/Quatrième niveau > Architecture plan updated/Plan d’architecture révisé :

Sports Center_Architecture_Fourth level_March 2, 2021

At/à : Sports Center/Centre sportif > Roof level/Niveau toiture > New Architecture plan added/Nouveau plan d’architecture :

Sports Center_Architecture_Roof level_March 2, 2021

And/et :

At/à : Trades school/École des métiers > elevation/élévation : New plan added/Nouveau plan rajouté :

Trades school_Elevation_View of workshop inside wall_Feb 19, 2021

FEBUARY 15, 2021 – 15 FÉVRIER 2021

At/à : Sports Center/Centre Sportif > First level/Premier niveau > Information > Add image of pool/rajouter l’image de la piscine

And/et : Text/Texte : Olympic Swimming Pool/Piscine Olympique.

FEBUARY 11, 2021 – 11 FÉVRIER 2021

At/à : New plans/Nouveaux plans.

  • Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > CAFETERIA_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à : > Sports Center/Centre sportif

  • Fourth level/Quatrième niveau
  • Gym fitness/Conditionnement physique (New selection/nouvelle sélection)
  • Image and text added/Image et texte rajouté
  • Text/Texte : Physical activities in education/Activité physique en éducation.

FEBUARY 6, 2021 – 6 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Third level > Plumbing > AUDITORIUM_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > First level > Plumbing > POOL_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > First level > Plumbing > POOL_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

FEBUARY 5, 2021 – 5 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Fourth level > Plumbing > LABS_GIRLS LEFT RESTROOM_FEB 1, 2021

And/et

At/à ; New plans/Nouveaux plans.

  • Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_BOYS LEFT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS RIGHT RESTROOM_FEB 1, 2021
  • Plans > Sports Center > Second level > Plumbing > GYMNASE_GIRLS LEFT RESTROOM_FEB 1, 2021
  • And/et

FEBUARY 3, 2021 – 3 FÉVRIER 2021

At/à ; New plans/Nouveaux plans.

  • Plans > Trades school > First floor > Plumbing
  • Plans > Trades school > Second floor > Plumbing
  • Plans > Trades school > Third floor > Plumbing

FEBUARY 2, 2021 – 2 FÉVRIER 2021

At/à : Plans > College/Collège > First floor/Premier étage > Plumbing/Plomberie : New plans added/nouveaux plans rajoutés

  • College_First floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_First floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_First floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021

And/et

  • College_Second floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Second floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Second floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021

And/et

  • College_Third floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
  • College_Third floor_Plumbing_Showers_Feb 1, 2021
  • And/et
  • College_Fourth floor_Plumbing_Boys restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Girls restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Reduced mobility restrooms_Feb 1, 2021
  • College_Fourth floor_Plumbing_Showers_Feb 1, 2021

JANUARY 29, 2021 – 29 JANVIER 2021

New plans added/Nouveaux plans rajoutés :

At/à : Plans > Trades school > Structure > Basement footings

And/et

At/à : Plans > Trades school > First floor > Footing > Footings & columns

Plans > Trades school > Second floor > Structure > Columns & Beams

Plans > Trades school > Third floor > Structure > Columns & Beams

JANUARY 27, 2021 – 27 JANVIER 2021

At/à : Project volunteers/Bénévoles

  • Work at home/Travail à la maison
  • Institutional architecture/Architecture institutionnelle
  • New text added/Nouveau texte rajouté

And/et :

At/à : Water management/Gestion de l’eau >

  • Rainwater harvest/Collecte eau de pluie
  • Detailed plans/Plans détaillés
  • New plan added/Nouveau plan rajouté
  • Rainwater harvest columns characteristics

JANUARY 26, 2021 – 26 JANVIER 2021

At/à : Water management/Gestion de l’eau >

Rainwater treatment/Traitement de l’eau de pluie >

Text added/texte rajouté : Rainwater Harvesting – Treatment process.

And/et :

At/à : Water management / Gestion de l’eau

  • Rainwater harvesting / Collecte eau de pluie
  • Detailed plans/Plans détaillés
  • New drawing added/Rajout d’un nouveau dessin
  • Rainwater Harvest Flow into columns & pre-filters.

And/et :

At/à : Water management / Gestion de l’eau

  • New selection added/Nouvelle selection rajoutée.
  • Stormwater treatment/Traitement eau d’orage

JANUARY 25, 2021 – 25 JANVIER 2021

At/à : Project planning/Planification du projet

  • Design progression/Progression conceptuelle
  • Development chart updated/Tableau de développement mis à jour.

JANUARY 23, 2021 – 23 JANVIER 2021

At/à : Water management/Gestion de l’eau >

Rainwater treatment/Traitement de l’eau de pluie >

Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.

And/et :

At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >

Gymnase glass walls (new selection – New plan/Nouvelle selection – Nouveau plan.

And/et :

At/à : Water management/Gestion de l’eau >

Rainwater harvest/Collecte eau de pluie >

Detailed plans/Plans détaillés (new selection added/nouvelle sélection rajoutée. At this selection/à cette selection: New plan added/nouveau plan rajouté.

JANUARY 21, 2021 – 21 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Third level/Troisième niveau > Steel beams auditorium floor – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Elevation/Élévation >

Inside view of front wall (new selection – New plan/Nouvelle selection – Nouveau plan.

JANUARY 19, 2021 – 19 JANVIER 2021

At/à : Water management / Gestion de l’eau

  • Rainwater harvesting / Collecte eau de pluie
  • Image and text added / Image et teste rajoutée

At/à : Water management / Gestion de l’eau

  • Rainwater treatment / Traitement eau de pluie
  • Image added / Image rajoutée

At/à : Water management / Gestion de l’eau

  • Wastewater treatment / Traitement de l’eau usée

Image added / Image rajoutée

JANUARY 18, 2021 – 18 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Structure > Second level/Deuxième niveau – Revised plan/Plan révisé.

 

JANUARY 17, 2021 – 17 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Second level/Deuxième niveau > Court markings – New plan added/Nouveau plan rajouté.

And/et

At/à : Vertical selection : Rainwater/Eau de pluie, changed for/Changé pour : Water management /Gestion de l’eau

And at/et à :Water management /Gestion de l’eau > add new sélections/rajouter les nouvelles sélections :

Rainwater harvesting/Collecte eau de pluie

Rainwater treatment/Traitement eau de pluie

Wastewater treatment/Traitement eau usée

And/et

At/à : Construction site/Site de construction > New plan added/Nouveau plan rajouté.

At/à : Plans > Sports Center/Centre Sportif > Architecture > Second level/Deuxième niveau – Plan revised/Plan révisé.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > First level/Premier niveau – Footings/Empattement > New plan/Nouveau plan.

 

JANUARY 12, 2021 – 12 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Structure > Third level/Troisième niveau – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > Fourth level/quatrième niveau – New plan/Nouveau plan.

And/et

At/à : Plans > Sports Center/Centre Sportif > Structure > Roof /Toiture –

New selection/Nouvelle sélection – New plan/Nouveau plan.

And/et

At/à : Plans > College/Collège > Roof /Toiture

New selection/Nouvelle sélection

And/et

At/à : Plans > Trades school/École des Métiers > Roof /Toiture

New selection/Nouvelle sélection

At/à : Latest updates/Dernières mises à jour

Reversed scroll down for previous updates/

Déroulement inversé pour les mises à jours antérieures.

 

 

JANUARY 11, 2021 – 11 JANVIER 2021

At/à : Plans > Sports Center/Centre Sportif > Architecture > Third level/Troisième niveau – Plan revised/Plan révisé.

 

Latest updates of 2020 – Dernières mises à jour de 2020

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline